PROJECT BRIEF

Project for The Improvement of Facilities and Training Equipment of National Fisheries College

Project for The Improvement of Facilities and Training Equipment of National Fisheries College
OUTLINE OF THE PROJECT

The National Fisheries College (NFC) is the only institution in Papua New Guinea that trains a wide range of fisheries personnel, offering courses from seafarer training to short courses for small-scale fishers. However, its existing waterfront facilities are cramped and aging and face safety problems from wave overtopping. In addition, its training vessel, now more than 20 years old, requires increasingly costly repairs, which hampers training. This project provides waterfront training facilities and equipment, including a training vessel, aiming to improve the safety and efficiency of practical training and to support the introduction of new courses.

The Client

National Fisheries Authority

Location

Kavieng, New Ireland Province

Construction Term

Jan., 2028 (Facilities), TBD (Vessel)

The Consultant

​

The Contractor

​

Facilities
<Civil Works>

[Civil engineering facilities]
Jetty: L37m×W7m, Connection bridge: 20m×W12m Steel pipe piles & reinforced concrete superstructure
Water depth: C.D.L.-5.0m
Seawall: Gabion stone masonry, L117m

Facilities
<Architectural Works>

[Training vessel]
Total length: abt. 32.5m, width: 7.2m, draft: 2.7m
International gross tonnage: 210t, Speed: 12kt
Materials: Steel (main hull) / Aluminum alloy (upper parts)
Main engine: Medium-speed diesel x 1 (Output: 730kw)
Crew capacity: 30, Voyage duration: 20 days, Distance: 2,800nm

[Onshore facilities]
Fishing gear & safety workshop: 2 story, 670m2 in total
External facilities: Paving/septic tank, outdoor lighting, etc.

Equipment

[Training Equipment]
Lifeboat with training davit, FRP boat for set net training, lifting vehicles

​Other

Survey Period: Jan. 2025 – Feb. 2025