PROJECT BRIEF

Project for Renovation of Seawater Supply System

Project for Renovation of Seawater Supply System
OUTLINE OF THE PROJECT

In Tonga, where agriculture, forestry, and fisheries are the main industries, major coastal resources such as giant clams had declined due to increased fishing, and stock recovery through seed release was needed. The country's Fisheries Research Centre had been conducting research on aquaculture and stock enhancement, but because it drew seawater from inside the lagoon, water quality was unstable, and with aging equipment, deaths of reared organisms due to low salinity and water supply failures occurred frequently. This project installed a seawater intake system drawing water from the reef edge through an intake pipe, together with a pump house and related facilities, aiming to secure a stable supply of good-quality seawater, a stable supply of healthy seedlings, and more active research.

The Client

Ministry of Fisheries, Kingdom of Tonga

Location

Nuku'alofa, Tongatapu Island

Construction Term

Mar., 2000

The Consultant

​

The Contractor

​

Facilities
<Civil Works>

Drainage Ditch
Settling Basin

Facilities
<Architectural Works>

Intake System
Pump House
Night worker's station: Nap Room, Rest & Kitchenette Room, Restroom & Shower Room
Rearing Shed

On-site Electrical Wiring and Lighting Facilities
Emergency Generator
Plumbing and Sanitary Facilities

Equipment

Giant Clam Rearing Tanks
Green Snail Rearing Tanks
Small Tanks
Small Observation Tanks

​Other

Survey Period: September 1998 to March 1999