PROJECT BRIEF
Project for Improvement of Funafuti Port
OUTLINE OF THE PROJECT
The Client
Department of Fisheries, Department of Marine, Tuvalu
Location
Funafuti Port, Funafuti Island, TUVALU
Construction Term
January 2008 to March 2009
The Consultant
Fisheries Engineering Co., Ltd.
The Contractor
DAI NIPPON CONSTRUCTION
Facilities
<Civil Works>
1. L-shaped jetty
- Length: L80.0 m x W16.0 m + L50.0 m x W12.0 m
- Foundation: Steel pipe pile type
- Upper structure: RC.
2. Access bridge
- L51.5 m x W8.0 m
3. Quay for fishing boats
- Length: 12.0 m with steps
4. Seawall
- Length: 103 m (H=1.45 m)
5. Container yard (600 sq. m.)
6. Other Facilities
- Mooring dolphins, Navigation aids
Facilities
<Architectural Works>
1. Repair of the warehouse (Floor area: 875 sq. m.)
2. Water Tank (Capacity: 600 cu. m.)
Equipment
1. Forklift
2. Trailer
3. Tractor