Project for Construction of Fish Market Center at Majuro Atoll

Project for Construction of Fish Market Center at Majuro Atoll
OUTLINE OF THE PROJECT

The Client

Marine Resources Authority, Republic of the Marshall Islands (MIMRA)

Location

ULIGA Dock, Majuro, RMI.

Construction Term

November 2009 to August 2011

The Consultant

Fisheries Engineering Co., Ltd.

The Contractor

DAI NIPPON CONSTRUCTION

Facilities
<Civil Works>

1. Dock
- Steel sheet pile structure
- Length:90m (berth length:40m)
2. Land reclamation
- Volume: about 7,400 cu.m.
3. Apron paving
- Concrete paving: 600 sq.m.
4. Ancillary facilities
- Derrick crane, Bit, Fender, Curb

Facilities
<Architectural Works>

1. Fish market center building (Floor area: 406.0 sq.m)
- Ice-making machine (Capacity: 1ton/day)
- Ice Storage (Capacity: 2ton)
- Chilled storage (Capacity: 0.5ton)
2. Water catchment tank (Capacity: 20 cu.m.)
3. Elevated water tank (H=10.8m)
4. Other facilities
- Toilet, Garbage depository, Solar power system, Parking lot
5. Equipment for the market
- Fish carrying boxes, Carts, Insulated tanks, Fish storage boxes, Band saw, SSB radiotelephones, VHF radiotelephones, etc.

Equipment

Fish collection boats
- 2 boats
- Hull material: FRP (Fiberglass Reinforced Plastic)
- Length overall: 16.0 m
- Breadth: 3.2 m
- Gross tonnage: 14 ton (International)
- Fish hold capacity: about 5 cu.m. (Divided into 6 compartments)

bottom of page